- Day 1: Prep, sanding and stain. We protect the work area, repair any problem spots, sand the floor to bare wood with dustless equipment, and apply stain if you chose a color.
- Day 2: Finish coats. We apply the first coats of finish with proper dry time between each.
- Day 3: Final coat and walkthrough. After the final coat, we walk through the job with you and explain care and cure times.
Smaller projects can finish sooner, and larger or more complex jobs take longer.